Under-feed stokers work best for _________ coals high in volatile matter and with caking tendency?
A
anthracite
B
lignite
C
semibituminous and bituminous
By: Admin
Correct
View Full Question →
652
Example of overfeed type stoker is___________?
A
chain grate
B
spreader
C
travelling grate
D
all of the above
By: Admin
Correct
View Full Question →
653
Where unpulverised coal has to be used and boiler capacity is large, the stoker which is used is______________?
A
underfeed stoker
B
overfeed stoker
C
any
By: Admin
Correct
View Full Question →
654
TravelUng grate stoker can burn coals at the rates of____________?
A
50—75 kg/m per hour
B
75—100 kg/m per hour
C
100—150 kg/m per hour
D
150—200 kg/m2 per hour
By: Admin
Correct
View Full Question →
655
Blowing down of boiler water is the process_____________?
A
to reduce the boiler pressure
B
to increase the steam temperature
C
to control the solid concentration in the boiler water by removing some of the concentrated saline water
D
none of the above
By: Admin
Correct
View Full Question →
656
Deaerative heating is done to_____________?
A
Deaerative heating is done to
B
heat the water
C
heat the air in the water
D
remove dissolved gases in the water
By: Admin
Correct
View Full Question →
657
Reheat factor is the ratio of_____________?
A
isentropic heat drop to useful heat drop
B
adiabatic heat drop to isentropic heat drop
C
cumulative actual enthalpy drop for the stages to total is isentropic enthalpy heat drop
By: Admin
Correct
View Full Question →
658
The value of the reheat factor is of the order of_____________?
A
0.8 to 1.0
B
1.0 to 1.05
C
1.1 to 1.5
D
above 1.5
By: Admin
Correct
View Full Question →
659
Compounding of steam turbine is done for_______________?
A
reducing the work done
B
increasing the rotor speed
C
reducing the rotor speed
D
balancing the turbine
By: Admin
Correct
View Full Question →
660
At low value of power factor, the cost of generation of a power station will be____________?
A
high
B
low
C
remain same
D
none of the above
By: Admin
Correct
View Full Question →
‹
1
...
65
66
67
...
370
›
GO
MCQs Categories
MAIN MCQS MENU
Accounting Mcqs
Auditing Mcqs
Biology Mcqs
Chemistry Mcqs
Computer Mcqs
English Mcqs
Everyday Science Mcqs
Finance Mcqs
General Knowledge MCQs
HRM Mcqs
Islamic Studies Mcqs
Management Sciences
Marketing Mcqs
Maths Mcqs
Pak Study Mcqs
Pakistan Current Affairs MCQs
Pedagogy Mcqs
Physics Mcqs
URDU Mcqs
World Current Affairs MCQs
ENGINEERING MCQS
Chemical Engineering Mcqs
Civil Engineering Mcqs
Electrical Engineering Mcqs
Mechanical Engineering Mcqs
Software Engineering Mcqs
MEDICAL SUBJECTS
Biochemistry
Dental Materials
General Anatomy Mcqs
Medical Mcqs
Microbiology
Oral Anatomy
Oral Histology
Oral Pathology and Medicine
Pathology
Pharmacology
Physiology Mcqs
OTHER SUBJECTS
Agriculture Mcqs
Economics Mcqs
English Literature Mcqs
Forestry Mcqs
International Relations Mcqs
Judiciary And Law Mcqs
Physical Education Mcqs
Political Science Mcqs
Psychology Mcqs
Sociology Mcqs
Statistics Mcqs
SUBMIT MCQS
Submit Mcqs
QUIZ MENU
Computer Online Quiz
Everyday Science Quiz
General Knowledge Quiz
Islamic Studies Mcqs Quiz
Pakistan Studies Quiz
ELECTION OFFICER
Election Officer Mcqs
Previous questions
Next questions