Which of the following is not a part of process change ?

A
Introducing new practices, methods or processes
B
Introducing new team members to existing project
C
Introducing or removing deliverable
D
Introducing new roles or responsibilities
By: Admin
Correct

How to Study This software-engineering Question

This question belongs to the software-engineering preparation set on McqsBase. Read the question carefully, compare every option, and focus on why the correct answer is better than the distractors. This method improves recall and helps you handle similar MCQs in FPSC, SPSC, PPSC, NTS, CSS, PMS, and university entry tests.

For stronger preparation, revise the related topic after solving the MCQ, then attempt more questions from the same category. Repeated practice builds speed, accuracy, and confidence for one-paper exams where small wording differences can change the answer.

Share this Question